DEMO: Cedar Sandbox Compute Campus (fictional)
Fictional demonstration record
This record is not a real, proposed, approved or operating facility. It exists to demonstrate how the registry handles evidence, missing values, supersession and disclosure limits.
- Registry ID
- DEMO-FAC-001
- Legal project name
- DEMO Cedar Sandbox Compute Campus Ltd. (fictional)
- Aggregation review
- review-required
- Current source
- FICTIONAL demonstration source v2: not evidence of a real facilityPC-SRC-DEMO-002Fictional source, no external link
Identity, ownership and control
Who owns and operates the record, with protected commercial detail withheld by reason category instead of silently deleted.
DEMO Cedar Sandbox Cooperative (fictional)
ownerReported- Effective from
- 2026-08-24
- Review status
- verified
DEMO Compute Operations Ltd. (fictional)
operatorNot applicable- Effective from
- 2026-08-24
- Review status
- verified
- Ownership percentProtected
- Control mechanismProtected
Location and authority context
General public location at a security-appropriate precision. Parcel detail is protected, and First Nations process fields are Nation-controlled.
- General location
- Fictional Interior B.C. demonstration area, no real coordinates
- Municipality or regional district
- DEMO Regional District (fictional)
- Land tenure category
- not-disclosed
- Coordinate precision
- region
- Watershed
- DEMO Watershed (fictional)
- Grid / service territory
- DEMO utility context (fictional)
- Authority
- DEMO Regional Authority (fictional)
- Parcel/site identifierProtected
- First Nations process statusNation-controlled
- Nation-approved public summaryNation-controlled
- Sensitive receptor / emergency contextProtected
The registry does not identify or determine rights holders, consultation or accommodation duties, or consent. Potentially affected Nations are identified only through authoritative processes.
Lifecycle and milestones
Planned versus actual dates stay separate, and a missing date stays visibly unknown.
feasibility
Unknown- Planned date
- 2027-06-30
- Actual date
- Not yet recorded
- Source
- FICTIONAL demonstration source v1: not evidence of a real facilityPC-SRC-DEMO-001Fictional source, no external link
Electricity and grid
Requested, allocated, contracted and connected MW are four different fields. This record shows each one separately with its own state and evidence.
Requested MW
Committed / expectedSuperseded10 MW
- Boundary and method
- Fictional initial utility inquiry; facility service boundary
- Supply / service class
- unknown
- Additionality
- no claim
Requested MW
Committed / expectedReported12.5 MW
- Boundary and method
- Fictional revised utility inquiry; facility service boundary
- Supply / service class
- unknown
- Additionality
- no claim
Allocated MW
Actual / deliveredUnknownUnknown
- Boundary and method
- No fictional allocation decision exists
- Supply / service class
- not-applicable
- Additionality
- not-applicable
Contracted MW
Actual / deliveredNot applicableNot applicable
- Boundary and method
- No fictional contract exists
- Supply / service class
- not-applicable
- Additionality
- not-applicable
Connected MW
Actual / deliveredNot applicableNot applicable
- Boundary and method
- Fictional facility is not connected
- Supply / service class
- not-applicable
- Additionality
- not-applicable
Annual energy
Committed / expectedDisputed65,000 MWh
- Reporting period
- 2028-01-01 to 2028-12-31
- Boundary and method
- Fictional whole-facility forecast; annual period; methodology disputed
- Supply / service class
- unknown
- Renewable claim
- 75% claimed. Fictional annual contractual matching; no claim of hourly matching
- Additionality
- Fictional proponent claim; not verified
- Additionality evidence
- FICTIONAL demonstration source v1: not evidence of a real facilityPC-SRC-DEMO-001Fictional source, no external link
- Grid upgrade / cost responsibilityProtected
Water, cooling, heat and backup generation
PUE and WUE only appear with their boundary, period, method context and assurance status. Heat that exists is not heat that is reused.
Annual withdrawal
Committed / expectedReported3,000 m3/year
- Reporting period
- 2028-01-01 to 2028-12-31
- Measurement boundary
- Fictional whole-facility utility meter
- Method and climate/load context
- Fictional estimate; annual average; 70% IT load; temperate climate assumption
- Assurance status
- not-reviewed
- Water source / cooling mode
- Fictional municipal supply; closed-loop air-assisted cooling
- Heat quality and availability
- not-applicable
Annual consumption
Committed / expectedReported2,400 m3/year
- Reporting period
- 2028-01-01 to 2028-12-31
- Measurement boundary
- Fictional whole-facility utility meter
- Method and climate/load context
- Fictional estimate; annual average; 70% IT load; temperate climate assumption
- Assurance status
- not-reviewed
- Water source / cooling mode
- Fictional municipal supply; closed-loop air-assisted cooling
- Heat quality and availability
- not-applicable
Peak-day withdrawal
Committed / expectedReported18 m3/day
- Reporting period
- 2028-07-01 to 2028-09-30
- Measurement boundary
- Fictional whole-facility utility meter
- Method and climate/load context
- Fictional summer design-day estimate; full IT load; hot-day cooling mode
- Assurance status
- not-reviewed
- Water source / cooling mode
- Fictional municipal supply; air-assisted cooling
- Heat quality and availability
- not-applicable
PUE
Committed / expectedReported1.28 ratio
- Reporting period
- 2028-01-01 to 2028-12-31
- Measurement boundary
- Fictional whole facility including cooling and power distribution
- Method and climate/load context
- Fictional annual design estimate; 70% IT load; temperate climate assumption
- Assurance status
- not-reviewed
- Water source / cooling mode
- Fictional closed-loop air-assisted cooling
- Heat quality and availability
- not-applicable
WUE
Committed / expectedReported0.04 L/kWh
- Reporting period
- 2028-01-01 to 2028-12-31
- Measurement boundary
- Fictional onsite water consumption divided by IT energy
- Method and climate/load context
- Fictional annual design estimate; 70% IT load; temperate climate assumption
- Assurance status
- not-reviewed
- Water source / cooling mode
- Fictional closed-loop air-assisted cooling
- Heat quality and availability
- not-applicable
Heat technically recoverable
Committed / expectedReported9,000 MWh
- Reporting period
- 2028-01-01 to 2028-12-31
- Measurement boundary
- Fictional facility heat-exchanger boundary
- Method and climate/load context
- Fictional engineering estimate; no committed offtaker
- Assurance status
- not-reviewed
- Water source / cooling mode
- Fictional liquid loop
- Heat quality and availability
- 35–45 C; estimated 8,000 h/year; no delivered reuse
Backup noise
Committed / expectedNot publicly disclosedNot publicly disclosed
- Reporting period
- 2028-01-01 to 2028-12-31
- Measurement boundary
- Public-safe facility boundary; exact equipment locations excluded
- Method and climate/load context
- No fictional study; value withheld for demo state coverage
- Assurance status
- not-reviewed
- Water source / cooling mode
- not-applicable
- Heat quality and availability
- not-applicable
Environmental and physical impacts
Baseline, forecast and actual values stay separate, with permits and conditions cited where they exist.
operational-ghg
Committed / expectedReported125 tCO2e/year
- Boundary, method and period
- Fictional Scope 1 backup generation; calendar 2028; GHG Protocol-style estimate
- Permit / condition
- No real permit; fictional demo condition only
biodiversity
BaselineUnknownUnknown
- Boundary, method and period
- Fictional study area; no real location or baseline study
- Permit / condition
- not-applicable
Employment, procurement and community commitments
Committed numbers and delivered numbers are different claims. Each row is labelled as one or the other.
permanent-jobs
Committed / expectedReported25
- Unit and definition
- FTE; fictional direct permanent roles in B.C.; excludes indirect estimates
- Reporting period
- 2028-01-01 to 2028-12-31
canadian-procurement
Actual / deliveredUnknownUnknown
- Unit and definition
- CAD and supplier-location definition not yet established
- Agreement / milestoneProtected
Indigenous ownership, governance and data arrangements
This entire table is Nation-controlled. Nothing from it serializes to the public projection, this page, exports or metadata.
Collection, interpretation, use, retention and publication of this field family are governed by the relevant Nation or authorized body. The registry publishes it only where disclosure is authorized, and no such authorization exists for any current record. Review rules PC-REV-001 and PC-REV-002 in the canonical pack keep this exclusion in force until authorized reviewers clear them.
- Indigenous governance record IDNation-controlled
- Facility IDNation-controlled
- Arrangement typeNation-controlled
- Agreement existence / statusNation-controlled
- Nation-approved public summaryNation-controlled
- Data-governance arrangementNation-controlled
- Disclosure authority referenceNation-controlled
- Disclosure review dateNation-controlled
- Disclosure classNation-controlled
- Value stateNation-controlled
Benefits, procurement, equity or revenue arrangements are never a substitute for rights, title, consultation, accommodation, consent or Nation decision authority.
Compute, sovereignty and access
Compute capacity appears only with its workload, precision and period context. There is no cross-hardware league table, and security detail stays protected.
installed
Reported10,000
- Capacity metric
- Fictional accelerator-hours for a documented training workload and precision; not cross-hardware comparable
- Method, period and context
- Fictional annual accelerator-hours; stated workload and precision; excludes downtime
- Access program / audience
- research
- Eligibility, price and allocation
- Fictional open call; price unknown; allocation mechanism unknown
- Utilization / delivered outcome
- unknown; no customer or workload data
delivered
Not applicableNot applicable
- Capacity metric
- Fictional research-access accelerator-hours; methodology not finalized
- Method, period and context
- No operating period; fictional facility is not operating
- Access program / audience
- research
- Eligibility, price and allocation
- unknown
- Utilization / delivered outcome
- not-applicable
- Hardware category / generationProtected
- Residency, control, support, and operationsProtected
- Security attestationProtected
Approvals, reporting and compliance
Instruments, conditions, filings and reported compliance, with the issuing authority named.
DEMO-PERMIT-001: FICTIONAL, NOT AN APPROVAL
not-assessed- Issuing authority
- DEMO Regional Authority (fictional)
- Condition / commitment
- Fictional annual public filing condition
- Reporting deadline
- 2028-03-31
- Filing source
- FICTIONAL demonstration source v1: not evidence of a real facilityPC-SRC-DEMO-001Fictional source, no external link
- Assurance provider and scope
- No real provider; fictional limited review of annual energy only
- Breach, notice or remedy
- not-applicable
- Penalty, clawback or reallocation
- not-applicable
- Review status
- not-reviewed
- Decommissioning obligation / securityProtected
Commitments versus delivered performance
A commitment is not delivered performance. Targets and actuals sit side by side, and a missing actual stays visibly unreported.
water
ReportedFictional commitment to keep annual consumption at or below 2,500 m3/year
- Commitment target
- 2,500
- Delivered actual
- Not yet reported
- Unit and period
- m3/year; calendar 2028; actual not yet reported
- Due date / status
- 2029-03-31; open
access
DisputedFictional research-access commitment
- Commitment target
- 1,000
- Delivered actual
- Not yet reported
- Unit and period
- accelerator-hours; 2028; methodology pending
- Due date / status
- 2029-03-31; open
Material changes and version history
Corrections and revisions append history instead of overwriting it. Superseded values stay on the record.
Numeric value
material-change10 became 12.5 on 2027-01-15, recorded 2027-01-20.
- Record
- DEMO-ELEC-001
- Reason and review
- Fictional design revision; verified
- Source
- FICTIONAL demonstration source v2: not evidence of a real facilityPC-SRC-DEMO-002Fictional source, no external link
Verification status
supersessionestimated became superseded on 2027-01-15, recorded 2027-01-20.
- Record
- PC-SRC-DEMO-001
- Reason and review
- Fictional source revision; verified
- Source
- FICTIONAL demonstration source v2: not evidence of a real facilityPC-SRC-DEMO-002Fictional source, no external link
Sources and verification
Every value on this page traces to one of these sources, each with its verification status, effective period and review dates.
- FICTIONAL demonstration source v1: not evidence of a real facilityPC-SRC-DEMO-001Fictional source, no external link
- Verification
- superseded
- Effective period
- 2026-08-24/2027-01-14
- Retrieved
- 2026-08-24
- Last reviewed
- 2026-08-24
- Dispute / correction
- superseded by fictional revision
- Superseded by
- PC-SRC-DEMO-002
- FICTIONAL demonstration source v2: not evidence of a real facilityPC-SRC-DEMO-002Fictional source, no external link
- Verification
- estimated
- Effective period
- 2027-01-15/2027-12-31
- Retrieved
- 2027-01-20
- Last reviewed
- 2027-01-20
- Dispute / correction
- none