 "schemaVersion": "bcai-public-compute-registry-v1",
 "schemaId": "PC-REGISTRY-SCHEMA-001",
 "schemaStatus": "prototype",
 "schemaEffectiveDate": "2026-08-24",
 "fixtureId": "DEMO-REGISTRY-001",
 "recordNature": "fictional-demo",
 "warning": "FICTIONAL DEMONSTRATION DATA: NOT A REAL, PROPOSED, APPROVED, OR OPERATING FACILITY",
 "recordsId": "BCPC-RECORDS-001",
 "recordsNotice": "PUBLIC-SOURCE RECORDS, STAGED FOR REVIEW: every value traces to a cited public source and nothing here is a determination about any project, person, Nation or authority.",
 "recordsStatus": "staged-for-review",
 "recordNatures": [
  {
   "nature": "fictional-demo",
   "count": 2
  },
  {
   "nature": "real-public-record",
   "count": 4
  }
 ],
 "rightsDisclaimer": "The registry does not identify or determine rights holders, consultation or accommodation duties, consent, engineering feasibility, security posture, or legal compliance.",
 "projection": "public",
 "excluded": {
  "tables": [
   "Indigenous_Governance"
  ],
  "disclosureClasses": [
   "nation-controlled",
   "protected"
  ],
  "note": "Nation-controlled field or record classification overrides every generic public flag and remains excluded until PC-REV-001 and PC-REV-002 are explicitly cleared by authorized reviewers."
 },
 "records": {
  "Facilities": [
   {
    "facility_id": "DEMO-FAC-001",
    "record_nature": "fictional-demo",
    "legal_project_name": "DEMO Cedar Sandbox Compute Campus Ltd. (fictional)",
    "public_name": "DEMO: Cedar Sandbox Compute Campus (fictional)",
    "lifecycle_status": "feasibility",
    "aggregation_review_status": "review-required",
    "current_source_id": "PC-SRC-DEMO-002"
   },
   {
    "facility_id": "DEMO-FAC-002",
    "record_nature": "fictional-demo",
    "legal_project_name": "DEMO Cedar Sandbox Phase Two Ltd. (fictional)",
    "public_name": "DEMO: Cedar Sandbox Phase Two (fictional)",
    "lifecycle_status": "inquiry",
    "aggregation_review_status": "review-required",
    "current_source_id": "PC-SRC-DEMO-001"
   },
   {
    "facility_id": "PC-FAC-001",
    "record_nature": "real-public-record",
    "legal_project_name": null,
    "public_name": "111 East 5th Avenue rezoning site, Mount Pleasant, Vancouver",
    "lifecycle_status": "application",
    "aggregation_review_status": "review-required",
    "current_source_id": "PC-SRC-101"
   },
   {
    "facility_id": "PC-FAC-002",
    "record_nature": "real-public-record",
    "legal_project_name": null,
    "public_name": "150 West Georgia Street data centre site, downtown Vancouver",
    "lifecycle_status": "approved",
    "aggregation_review_status": "review-required",
    "current_source_id": "PC-SRC-104"
   },
   {
    "facility_id": "PC-FAC-003",
    "record_nature": "real-public-record",
    "legal_project_name": null,
    "public_name": "TELUS Kamloops data centre and Kamloops AI Factory",
    "lifecycle_status": "operating",
    "aggregation_review_status": "review-required",
    "current_source_id": "PC-SRC-102"
   },
   {
    "facility_id": "PC-FAC-004",
    "record_nature": "real-public-record",
    "legal_project_name": null,
    "public_name": "Fir at the Cedar Supercomputing Centre, Simon Fraser University, Burnaby",
    "lifecycle_status": "operating",
    "aggregation_review_status": "not-reviewed",
    "current_source_id": "PC-SRC-107"
   }
  ],
  "Organizations": [
   {
    "organization_id": "DEMO-ORG-001",
    "legal_name": "DEMO Cedar Sandbox Cooperative (fictional)",
    "organization_role": "owner",
    "incorporation_jurisdiction": "British Columbia, Canada",
    "contact_role": "Fictional regulatory affairs office",
    "current_source_id": "PC-SRC-DEMO-001"
   },
   {
    "organization_id": "DEMO-ORG-002",
    "legal_name": "DEMO Compute Operations Ltd. (fictional)",
    "organization_role": "operator",
    "incorporation_jurisdiction": "Canada",
    "contact_role": "Fictional public information office",
    "current_source_id": "PC-SRC-DEMO-001"
   },
   {
    "organization_id": "DEMO-ORG-003",
    "legal_name": "DEMO Regional Authority (fictional)",
    "organization_role": "authority",
    "incorporation_jurisdiction": "British Columbia, Canada",
    "contact_role": "Fictional permitting office",
    "current_source_id": "PC-SRC-DEMO-001"
   },
   {
    "organization_id": "PC-ORG-001",
    "legal_name": "Westbank Corp.",
    "organization_role": "developer-applicant",
    "incorporation_jurisdiction": null,
    "contact_role": "Project lead named on the City of Vancouver rezoning application page. Role only; no personal name, phone or email is recorded in this registry.",
    "current_source_id": "PC-SRC-101"
   },
   {
    "organization_id": "PC-ORG-002",
    "legal_name": "TELUS Communications Inc.",
    "organization_role": "operator",
    "incorporation_jurisdiction": "Canada",
    "contact_role": "Corporate media relations. Role only; no personal contact data.",
    "current_source_id": "PC-SRC-102"
   },
   {
    "organization_id": "PC-ORG-003",
    "legal_name": "Allied Properties Real Estate Investment Trust",
    "organization_role": "secured-lender",
    "incorporation_jurisdiction": null,
    "contact_role": "Investor relations. Role only; no personal contact data.",
    "current_source_id": "PC-SRC-104"
   },
   {
    "organization_id": "PC-ORG-004",
    "legal_name": "City of Vancouver",
    "organization_role": "authority",
    "incorporation_jurisdiction": "British Columbia, Canada",
    "contact_role": "Rezoning planner listed on the application page. Role only; no personal contact data.",
    "current_source_id": "PC-SRC-101"
   },
   {
    "organization_id": "PC-ORG-005",
    "legal_name": "British Columbia Hydro and Power Authority",
    "organization_role": "utility",
    "incorporation_jurisdiction": "British Columbia, Canada",
    "contact_role": "Large-load connections process. Role only; no personal contact data.",
    "current_source_id": "PC-SRC-105"
   },
   {
    "organization_id": "PC-ORG-006",
    "legal_name": "Simon Fraser University",
    "organization_role": "host-institution",
    "incorporation_jurisdiction": "British Columbia, Canada",
    "contact_role": "Research computing group. Role only; no personal contact data.",
    "current_source_id": "PC-SRC-107"
   },
   {
    "organization_id": "PC-ORG-007",
    "legal_name": "Digital Research Alliance of Canada",
    "organization_role": "funder-allocator",
    "incorporation_jurisdiction": "Canada",
    "contact_role": "Resource allocation administration. Role only; no personal contact data.",
    "current_source_id": "PC-SRC-109"
   }
  ],
  "Ownership_Control": [
   {
    "relationship_id": "DEMO-REL-001",
    "facility_id": "DEMO-FAC-001",
    "organization_id": "DEMO-ORG-001",
    "relationship_type": "owner",
    "effective_start": "2026-08-24",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "verified"
   },
   {
    "relationship_id": "DEMO-REL-002",
    "facility_id": "DEMO-FAC-001",
    "organization_id": "DEMO-ORG-002",
    "relationship_type": "operator",
    "effective_start": "2026-08-24",
    "effective_end": null,
    "value_state": "not-applicable",
    "review_status": "verified"
   },
   {
    "relationship_id": "DEMO-REL-003",
    "facility_id": "DEMO-FAC-002",
    "organization_id": "DEMO-ORG-001",
    "relationship_type": "related-project-common-control",
    "effective_start": "2026-08-24",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "review-required"
   },
   {
    "relationship_id": "PC-REL-001",
    "facility_id": "PC-FAC-001",
    "organization_id": "PC-ORG-001",
    "relationship_type": "rezoning-applicant",
    "effective_start": "2025-09-04",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "verified"
   },
   {
    "relationship_id": "PC-REL-002",
    "facility_id": "PC-FAC-001",
    "organization_id": "PC-ORG-004",
    "relationship_type": "local-government-authority",
    "effective_start": "2025-09-04",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "verified"
   },
   {
    "relationship_id": "PC-REL-003",
    "facility_id": "PC-FAC-002",
    "organization_id": "PC-ORG-001",
    "relationship_type": "borrower-developer",
    "effective_start": "2026-06-30",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "verified"
   },
   {
    "relationship_id": "PC-REL-004",
    "facility_id": "PC-FAC-002",
    "organization_id": "PC-ORG-003",
    "relationship_type": "secured-lender",
    "effective_start": "2026-06-30",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "verified"
   },
   {
    "relationship_id": "PC-REL-005",
    "facility_id": "PC-FAC-002",
    "organization_id": "PC-ORG-002",
    "relationship_type": "announced-operator-not-confirmed",
    "effective_start": "2026-05-11",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "review-required"
   },
   {
    "relationship_id": "PC-REL-006",
    "facility_id": "PC-FAC-003",
    "organization_id": "PC-ORG-002",
    "relationship_type": "owner-operator",
    "effective_start": "2025-04-15",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "verified"
   },
   {
    "relationship_id": "PC-REL-007",
    "facility_id": "PC-FAC-003",
    "organization_id": "PC-ORG-005",
    "relationship_type": "electricity-supplier-stated-by-proponent",
    "effective_start": "2026-05-11",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "review-required"
   },
   {
    "relationship_id": "PC-REL-008",
    "facility_id": "PC-FAC-004",
    "organization_id": "PC-ORG-006",
    "relationship_type": "host-institution",
    "effective_start": "2025-09-15",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "verified"
   },
   {
    "relationship_id": "PC-REL-009",
    "facility_id": "PC-FAC-004",
    "organization_id": "PC-ORG-007",
    "relationship_type": "funder-allocator",
    "effective_start": "2025-09-15",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "verified"
   },
   {
    "relationship_id": "PC-REL-010",
    "facility_id": "PC-FAC-002",
    "organization_id": "PC-ORG-002",
    "relationship_type": "related-project-common-proponent",
    "effective_start": "2026-05-11",
    "effective_end": null,
    "value_state": "reported",
    "review_status": "review-required"
   }
  ],
  "Locations_Authorities": [
   {
    "location_authority_id": "DEMO-LOC-001",
    "facility_id": "DEMO-FAC-001",
    "general_public_location": "Fictional Interior B.C. demonstration area, no real coordinates",
    "municipality_regional_district": "DEMO Regional District (fictional)",
    "land_tenure_category": "not-disclosed",
    "coordinate_precision": "region",
    "watershed": "DEMO Watershed (fictional)",
    "grid_service_territory": "DEMO utility context (fictional)",
    "authority_id": "DEMO-ORG-003"
   },
   {
    "location_authority_id": "PC-LOC-001",
    "facility_id": "PC-FAC-001",
    "general_public_location": "111 East 5th Avenue, Mount Pleasant, Vancouver. Civic address published by the City of Vancouver on its own application page.",
    "municipality_regional_district": "City of Vancouver",
    "land_tenure_category": "not-disclosed",
    "coordinate_precision": "civic-address",
    "watershed": "unknown",
    "grid_service_territory": "unknown; no retrieved source states the electricity service arrangement for this site",
    "authority_id": "PC-ORG-004"
   },
   {
    "location_authority_id": "PC-LOC-002",
    "facility_id": "PC-FAC-002",
    "general_public_location": "150 West Georgia Street, downtown Vancouver. Address named in the proponent release and in the lender's filed quarterly report.",
    "municipality_regional_district": "City of Vancouver",
    "land_tenure_category": "not-disclosed",
    "coordinate_precision": "civic-address",
    "watershed": "unknown",
    "grid_service_territory": "unknown; the filed report states a power allocation is in place but does not name the utility",
    "authority_id": "PC-ORG-004"
   },
   {
    "location_authority_id": "PC-LOC-003",
    "facility_id": "PC-FAC-003",
    "general_public_location": "Kamloops, British Columbia. The sources name the municipality; no site address or coordinates are recorded here.",
    "municipality_regional_district": "City of Kamloops",
    "land_tenure_category": "not-disclosed",
    "coordinate_precision": "municipality",
    "watershed": "unknown",
    "grid_service_territory": "BC Hydro, per the proponent statement that power is secured from BC Hydro. No utility record confirming service to this facility has been retrieved.",
    "authority_id": null
   },
   {
    "location_authority_id": "PC-LOC-004",
    "facility_id": "PC-FAC-004",
    "general_public_location": "Simon Fraser University Burnaby campus, Burnaby, British Columbia. Campus-level precision only.",
    "municipality_regional_district": "City of Burnaby",
    "land_tenure_category": "not-disclosed",
    "coordinate_precision": "campus",
    "watershed": "unknown",
    "grid_service_territory": "unknown; no retrieved source states the electricity service arrangement for the centre",
    "authority_id": null
   }
  ],
  "Lifecycle_Milestones": [
   {
    "milestone_id": "DEMO-MS-001",
    "facility_id": "DEMO-FAC-001",
    "milestone_type": "feasibility",
    "planned_date": "2027-06-30",
    "actual_date": null,
    "value_state": "unknown",
    "delay_days": null,
    "current_source_id": "PC-SRC-DEMO-001"
   },
   {
    "milestone_id": "DEMO-MS-002",
    "facility_id": "DEMO-FAC-002",
    "milestone_type": "inquiry",
    "planned_date": null,
    "actual_date": "2026-08-24",
    "value_state": "reported",
    "delay_days": null,
    "current_source_id": "PC-SRC-DEMO-001"
   },
   {
    "milestone_id": "PC-MS-001",
    "facility_id": "PC-FAC-001",
    "milestone_type": "application-received",
    "planned_date": null,
    "actual_date": "2025-09-04",
    "value_state": "reported",
    "delay_days": null,
    "current_source_id": "PC-SRC-101"
   },
   {
    "milestone_id": "PC-MS-002",
    "facility_id": "PC-FAC-001",
    "milestone_type": "public-question-period-closed",
    "planned_date": null,
    "actual_date": "2026-02-10",
    "value_state": "reported",
    "delay_days": null,
    "current_source_id": "PC-SRC-101"
   },
   {
    "milestone_id": "PC-MS-003",
    "facility_id": "PC-FAC-001",
    "milestone_type": "referral-to-public-hearing",
    "planned_date": null,
    "actual_date": "2026-07-14",
    "value_state": "reported",
    "delay_days": null,
    "current_source_id": "PC-SRC-101"
   },
   {
    "milestone_id": "PC-MS-004",
    "facility_id": "PC-FAC-001",
    "milestone_type": "public-hearing",
    "planned_date": "2026-07-23",
    "actual_date": null,
    "value_state": "superseded",
    "delay_days": null,
    "current_source_id": "PC-SRC-101"
   },
   {
    "milestone_id": "PC-MS-005",
    "facility_id": "PC-FAC-001",
    "milestone_type": "referred-back-to-staff",
    "planned_date": null,
    "actual_date": "2026-07-21",
    "value_state": "reported",
    "delay_days": null,
    "current_source_id": "PC-SRC-101"
   },
   {
    "milestone_id": "PC-MS-006",
    "facility_id": "PC-FAC-002",
    "milestone_type": "entitlement-and-power-allocation-reported-in-place",
    "planned_date": null,
    "actual_date": "2026-06-30",
    "value_state": "reported",
    "delay_days": null,
    "current_source_id": "PC-SRC-104"
   },
   {
    "milestone_id": "PC-MS-007",
    "facility_id": "PC-FAC-002",
    "milestone_type": "in-service",
    "planned_date": null,
    "actual_date": null,
    "value_state": "unknown",
    "delay_days": null,
    "current_source_id": "PC-SRC-102"
   },
   {
    "milestone_id": "PC-MS-008",
    "facility_id": "PC-FAC-003",
    "milestone_type": "original-facility-groundbreaking",
    "planned_date": null,
    "actual_date": "2012-06-29",
    "value_state": "reported",
    "delay_days": null,
    "current_source_id": "PC-SRC-106"
   },
   {
    "milestone_id": "PC-MS-009",
    "facility_id": "PC-FAC-003",
    "milestone_type": "ai-factory-in-service",
    "planned_date": null,
    "actual_date": null,
    "value_state": "unknown",
    "delay_days": null,
    "current_source_id": "PC-SRC-102"
   },
   {
    "milestone_id": "PC-MS-010",
    "facility_id": "PC-FAC-004",
    "milestone_type": "publicly-announced-online",
    "planned_date": null,
    "actual_date": "2025-09-15",
    "value_state": "reported",
    "delay_days": null,
    "current_source_id": "PC-SRC-107"
   }
  ],
  "Electricity": [
   {
    "electricity_record_id": "DEMO-ELEC-001",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "requested-mw",
    "metric_scenario": "expected",
    "numeric_value": 10,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "Fictional initial utility inquiry; facility service boundary",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "superseded"
   },
   {
    "electricity_record_id": "DEMO-ELEC-002",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "requested-mw",
    "metric_scenario": "expected",
    "numeric_value": 12.5,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "Fictional revised utility inquiry; facility service boundary",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "reported"
   },
   {
    "electricity_record_id": "DEMO-ELEC-003",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "allocated-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "No fictional allocation decision exists",
    "supply_service_class": "not-applicable",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "not-applicable",
    "additionality_evidence_source_id": null,
    "value_state": "unknown"
   },
   {
    "electricity_record_id": "DEMO-ELEC-004",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "contracted-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "No fictional contract exists",
    "supply_service_class": "not-applicable",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "not-applicable",
    "additionality_evidence_source_id": null,
    "value_state": "not-applicable"
   },
   {
    "electricity_record_id": "DEMO-ELEC-005",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "connected-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "Fictional facility is not connected",
    "supply_service_class": "not-applicable",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "not-applicable",
    "additionality_evidence_source_id": null,
    "value_state": "not-applicable"
   },
   {
    "electricity_record_id": "DEMO-ELEC-006",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "annual-energy-mwh",
    "metric_scenario": "expected",
    "numeric_value": 65000,
    "unit": "MWh",
    "period_start": "2028-01-01",
    "period_end": "2028-12-31",
    "boundary_method_context": "Fictional whole-facility forecast; annual period; methodology disputed",
    "supply_service_class": "unknown",
    "renewable_share_percent": 75,
    "renewable_methodology": "Fictional annual contractual matching; no claim of hourly matching",
    "additionality_claim": "Fictional proponent claim; not verified",
    "additionality_evidence_source_id": "PC-SRC-DEMO-001",
    "value_state": "disputed"
   },
   {
    "electricity_record_id": "PC-ELEC-001",
    "facility_id": "PC-FAC-001",
    "metric_kind": "requested-mw",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "The City of Vancouver rezoning application page (PC-SRC-101) states no electrical capacity for this site, and BC + AI has retrieved no utility record for it.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-002",
    "facility_id": "PC-FAC-001",
    "metric_kind": "allocated-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "The City of Vancouver rezoning application page (PC-SRC-101) states no electrical capacity for this site, and BC + AI has retrieved no utility record for it.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-003",
    "facility_id": "PC-FAC-001",
    "metric_kind": "contracted-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "The City of Vancouver rezoning application page (PC-SRC-101) states no electrical capacity for this site, and BC + AI has retrieved no utility record for it.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-004",
    "facility_id": "PC-FAC-001",
    "metric_kind": "connected-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "The rezoning is undecided and no data centre use is authorised at this site (PC-SRC-101), so there is no connected data centre load to report. Absence of a value here is not a statement that the existing building draws no power.",
    "supply_service_class": "not-applicable",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "not-applicable",
    "additionality_evidence_source_id": null,
    "value_state": "not-applicable"
   },
   {
    "electricity_record_id": "PC-ELEC-005",
    "facility_id": "PC-FAC-002",
    "metric_kind": "requested-mw",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "Allied's filed Q2 2026 quarterly report (PC-SRC-104) states that entitlement and power-allocation for a large-scale AI data centre are in place at this site. It discloses no megawatt figure, no utility instrument and no counterparty, so no value is recorded.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-006",
    "facility_id": "PC-FAC-002",
    "metric_kind": "allocated-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "Allied's filed Q2 2026 quarterly report (PC-SRC-104) states that entitlement and power-allocation for a large-scale AI data centre are in place at this site. It discloses no megawatt figure, no utility instrument and no counterparty, so no value is recorded.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-007",
    "facility_id": "PC-FAC-002",
    "metric_kind": "contracted-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "Allied's filed Q2 2026 quarterly report (PC-SRC-104) states that entitlement and power-allocation for a large-scale AI data centre are in place at this site. It discloses no megawatt figure, no utility instrument and no counterparty, so no value is recorded.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-008",
    "facility_id": "PC-FAC-002",
    "metric_kind": "connected-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "The facility is not built (PC-SRC-104), so there is no connected load. A reported allocation is not a connection.",
    "supply_service_class": "not-applicable",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "not-applicable",
    "additionality_evidence_source_id": null,
    "value_state": "not-applicable"
   },
   {
    "electricity_record_id": "PC-ELEC-009",
    "facility_id": "PC-FAC-003",
    "metric_kind": "requested-mw",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "No public utility record of a capacity request for this facility has been retrieved. TELUS states an initial 85 MW of clean, renewable power secured from BC Hydro (PC-SRC-102). The release does not say whether that is an allocation decision, a contract or existing service, does not split it across the three named sites, and does not say whether it moved through BC Hydro's 2026 Call for Demand (PC-SRC-105).",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-010",
    "facility_id": "PC-FAC-003",
    "metric_kind": "allocated-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "TELUS states an initial 85 MW of clean, renewable power secured from BC Hydro (PC-SRC-102). The release does not say whether that is an allocation decision, a contract or existing service, does not split it across the three named sites, and does not say whether it moved through BC Hydro's 2026 Call for Demand (PC-SRC-105).",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-011",
    "facility_id": "PC-FAC-003",
    "metric_kind": "contracted-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "TELUS states an initial 85 MW of clean, renewable power secured from BC Hydro (PC-SRC-102). The release does not say whether that is an allocation decision, a contract or existing service, does not split it across the three named sites, and does not say whether it moved through BC Hydro's 2026 Call for Demand (PC-SRC-105).",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-012",
    "facility_id": "PC-FAC-003",
    "metric_kind": "connected-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "The facility operates (PC-SRC-102), so a connected load exists. No public source states it, and it cannot be inferred from the proponent's 85 MW cluster figure.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "not-disclosed"
   },
   {
    "electricity_record_id": "PC-ELEC-013",
    "facility_id": "PC-FAC-003",
    "metric_kind": "peak-demand-mw",
    "metric_scenario": "expected",
    "numeric_value": 85,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "Cluster-level figure, not a figure for this facility. TELUS states an initial 85 MW secured from BC Hydro covering the Kamloops expansion and two Vancouver facilities together (PC-SRC-102). The split across sites is not published, the utility instrument is not named, and the release also states the cluster scaling to over 150 MW by 2032.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "reported"
   },
   {
    "electricity_record_id": "PC-ELEC-014",
    "facility_id": "PC-FAC-003",
    "metric_kind": "annual-energy-mwh",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "MWh",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "No public annual energy value exists for this facility. This row carries the proponent renewable-share claim attached to the facility, which two proponent releases state differently.",
    "supply_service_class": "unknown",
    "renewable_share_percent": 98,
    "renewable_methodology": "Proponent statement that the facilities are powered by 98 percent renewable energy (PC-SRC-102). No boundary, period, matching basis (annual or hourly) or accounting standard is published. An earlier proponent release states 99 percent for the Kamloops and Rimouski AI Factories (PC-SRC-103). Both figures are retained and neither is treated as correct.",
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "disputed"
   },
   {
    "electricity_record_id": "PC-ELEC-015",
    "facility_id": "PC-FAC-004",
    "metric_kind": "requested-mw",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "Fir is an installed cluster inside an existing university facility rather than a new utility interconnection (PC-SRC-107), and no capacity request is on the public record.",
    "supply_service_class": "not-applicable",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "not-applicable",
    "additionality_evidence_source_id": null,
    "value_state": "not-applicable"
   },
   {
    "electricity_record_id": "PC-ELEC-016",
    "facility_id": "PC-FAC-004",
    "metric_kind": "allocated-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "No public allocation record for the Cedar Supercomputing Centre has been retrieved; the host announcement (PC-SRC-107) states none.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "unknown"
   },
   {
    "electricity_record_id": "PC-ELEC-017",
    "facility_id": "PC-FAC-004",
    "metric_kind": "contracted-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "No public contracted capacity for the Cedar Supercomputing Centre has been retrieved; the host announcement (PC-SRC-107) states none.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "unknown"
   },
   {
    "electricity_record_id": "PC-ELEC-018",
    "facility_id": "PC-FAC-004",
    "metric_kind": "connected-mw",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "The centre operates (PC-SRC-107), so a connected load exists. No public source states it, and the benchmark power figure below is not a substitute.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "unknown"
   },
   {
    "electricity_record_id": "PC-ELEC-019",
    "facility_id": "PC-FAC-004",
    "metric_kind": "peak-demand-mw",
    "metric_scenario": "actual",
    "numeric_value": 0.47573,
    "unit": "MW",
    "period_start": null,
    "period_end": null,
    "boundary_method_context": "TOP500 measured power for the GPU partition during the High Performance Linpack run, published as 475.73 kW and recorded here as 0.47573 MW (PC-SRC-108). This is a benchmark-run measurement of one partition. It is not a facility electrical load, not a building peak, and not an annual average.",
    "supply_service_class": "unknown",
    "renewable_share_percent": null,
    "renewable_methodology": null,
    "additionality_claim": "no claim",
    "additionality_evidence_source_id": null,
    "value_state": "reported"
   }
  ],
  "Water_Cooling_Heat": [
   {
    "water_heat_record_id": "DEMO-WCH-001",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "annual-withdrawal-m3-year",
    "metric_scenario": "expected",
    "numeric_value": 3000,
    "unit": "m3/year",
    "period_start": "2028-01-01",
    "period_end": "2028-12-31",
    "boundary": "Fictional whole-facility utility meter",
    "method_context": "Fictional estimate; annual average; 70% IT load; temperate climate assumption",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "Fictional municipal supply; closed-loop air-assisted cooling",
    "heat_temperature_availability": "not-applicable",
    "value_state": "reported"
   },
   {
    "water_heat_record_id": "DEMO-WCH-002",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "annual-consumption-m3-year",
    "metric_scenario": "expected",
    "numeric_value": 2400,
    "unit": "m3/year",
    "period_start": "2028-01-01",
    "period_end": "2028-12-31",
    "boundary": "Fictional whole-facility utility meter",
    "method_context": "Fictional estimate; annual average; 70% IT load; temperate climate assumption",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "Fictional municipal supply; closed-loop air-assisted cooling",
    "heat_temperature_availability": "not-applicable",
    "value_state": "reported"
   },
   {
    "water_heat_record_id": "DEMO-WCH-003",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "peak-day-withdrawal-m3-day",
    "metric_scenario": "expected",
    "numeric_value": 18,
    "unit": "m3/day",
    "period_start": "2028-07-01",
    "period_end": "2028-09-30",
    "boundary": "Fictional whole-facility utility meter",
    "method_context": "Fictional summer design-day estimate; full IT load; hot-day cooling mode",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "Fictional municipal supply; air-assisted cooling",
    "heat_temperature_availability": "not-applicable",
    "value_state": "reported"
   },
   {
    "water_heat_record_id": "DEMO-WCH-004",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "pue-ratio",
    "metric_scenario": "expected",
    "numeric_value": 1.28,
    "unit": "ratio",
    "period_start": "2028-01-01",
    "period_end": "2028-12-31",
    "boundary": "Fictional whole facility including cooling and power distribution",
    "method_context": "Fictional annual design estimate; 70% IT load; temperate climate assumption",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "Fictional closed-loop air-assisted cooling",
    "heat_temperature_availability": "not-applicable",
    "value_state": "reported"
   },
   {
    "water_heat_record_id": "DEMO-WCH-005",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "wue-l-kwh",
    "metric_scenario": "expected",
    "numeric_value": 0.04,
    "unit": "L/kWh",
    "period_start": "2028-01-01",
    "period_end": "2028-12-31",
    "boundary": "Fictional onsite water consumption divided by IT energy",
    "method_context": "Fictional annual design estimate; 70% IT load; temperate climate assumption",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "Fictional closed-loop air-assisted cooling",
    "heat_temperature_availability": "not-applicable",
    "value_state": "reported"
   },
   {
    "water_heat_record_id": "DEMO-WCH-006",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "heat-recoverable-mwh",
    "metric_scenario": "expected",
    "numeric_value": 9000,
    "unit": "MWh",
    "period_start": "2028-01-01",
    "period_end": "2028-12-31",
    "boundary": "Fictional facility heat-exchanger boundary",
    "method_context": "Fictional engineering estimate; no committed offtaker",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "Fictional liquid loop",
    "heat_temperature_availability": "35–45 C; estimated 8,000 h/year; no delivered reuse",
    "value_state": "reported"
   },
   {
    "water_heat_record_id": "DEMO-WCH-007",
    "facility_id": "DEMO-FAC-001",
    "metric_kind": "backup-noise-dba",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "dBA",
    "period_start": "2028-01-01",
    "period_end": "2028-12-31",
    "boundary": "Public-safe facility boundary; exact equipment locations excluded",
    "method_context": "No fictional study; value withheld for demo state coverage",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "not-applicable",
    "heat_temperature_availability": "not-applicable",
    "value_state": "not-disclosed"
   },
   {
    "water_heat_record_id": "PC-WCH-001",
    "facility_id": "PC-FAC-001",
    "metric_kind": "annual-consumption-m3-year",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "m3/year",
    "period_start": null,
    "period_end": null,
    "boundary": "No boundary published.",
    "method_context": "The City of Vancouver application page (PC-SRC-101) states no water use and no cooling design for this site.",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "not-disclosed",
    "heat_temperature_availability": "not-applicable",
    "value_state": "not-disclosed"
   },
   {
    "water_heat_record_id": "PC-WCH-002",
    "facility_id": "PC-FAC-001",
    "metric_kind": "heat-committed-mwh",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "MWh",
    "period_start": null,
    "period_end": null,
    "boundary": "No boundary published.",
    "method_context": "TELUS states that its Vancouver facilities are designed to integrate into the City of Vancouver's Neighbourhood Energy Utility in Mount Pleasant (PC-SRC-102). The City application page BC + AI retrieved records no heat-recovery condition, and the July 2026 referral report could not be retrieved. Heat recovery at this site is an unverified design intent, not a committed quantity.",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "not-disclosed",
    "heat_temperature_availability": "not-disclosed",
    "value_state": "not-disclosed"
   },
   {
    "water_heat_record_id": "PC-WCH-003",
    "facility_id": "PC-FAC-002",
    "metric_kind": "heat-committed-mwh",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "MWh",
    "period_start": null,
    "period_end": null,
    "boundary": "No boundary published.",
    "method_context": "TELUS states the Vancouver facilities are designed to integrate into Creative Energy's downtown district energy system and that recycled waste heat will heat more than 150,000 homes in metro Vancouver (PC-SRC-102). No megawatt-hour quantity, boundary, period, offtake agreement or delivered figure is published. A homes-equivalent comparison is not a delivered energy quantity.",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "not-disclosed",
    "heat_temperature_availability": "not-disclosed",
    "value_state": "not-disclosed"
   },
   {
    "water_heat_record_id": "PC-WCH-004",
    "facility_id": "PC-FAC-002",
    "metric_kind": "annual-consumption-m3-year",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "m3/year",
    "period_start": null,
    "period_end": null,
    "boundary": "No boundary published.",
    "method_context": "TELUS states water consumption will be 90 percent lower than traditional data centres, with plans to incorporate recycled water from BC Place (PC-SRC-102). A percentage reduction against an unnamed baseline is not a consumption value, so no number is recorded.",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "closed-loop liquid cooling, per the proponent release",
    "heat_temperature_availability": "not-applicable",
    "value_state": "not-disclosed"
   },
   {
    "water_heat_record_id": "PC-WCH-005",
    "facility_id": "PC-FAC-003",
    "metric_kind": "annual-consumption-m3-year",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "m3/year",
    "period_start": null,
    "period_end": null,
    "boundary": "No boundary published. The proponent claim covers the Rimouski and Kamloops AI Factories together, not Kamloops alone.",
    "method_context": "TELUS states that natural cooling systems reduce water consumption by more than 75 percent compared to traditional data centres, saving 17 million litres of water per year (PC-SRC-103). A stated saving is not a consumption value and the baseline is not named, so no consumption number is recorded.",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "natural cooling, per the proponent release",
    "heat_temperature_availability": "not-applicable",
    "value_state": "not-disclosed"
   },
   {
    "water_heat_record_id": "PC-WCH-006",
    "facility_id": "PC-FAC-003",
    "metric_kind": "annual-withdrawal-m3-year",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": "m3/year",
    "period_start": null,
    "period_end": null,
    "boundary": "No boundary published.",
    "method_context": "No public withdrawal figure has been retrieved; the proponent releases (PC-SRC-102, PC-SRC-103) state none. Withdrawal and consumption are separate metrics and neither can be derived from the other or from the cooling technology.",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "not-disclosed",
    "heat_temperature_availability": "not-applicable",
    "value_state": "unknown"
   },
   {
    "water_heat_record_id": "PC-WCH-007",
    "facility_id": "PC-FAC-004",
    "metric_kind": "annual-consumption-m3-year",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit": "m3/year",
    "period_start": null,
    "period_end": null,
    "boundary": "No boundary published.",
    "method_context": "No public water figure for the Cedar Supercomputing Centre has been retrieved; the host announcement (PC-SRC-107) states none.",
    "assurance_status": "not-reviewed",
    "water_source_cooling_mode": "not-disclosed",
    "heat_temperature_availability": "not-applicable",
    "value_state": "unknown"
   }
  ],
  "Environment": [
   {
    "environment_record_id": "DEMO-ENV-001",
    "facility_id": "DEMO-FAC-001",
    "impact_type": "operational-ghg",
    "metric_scenario": "expected",
    "numeric_value": 125,
    "unit": "tCO2e/year",
    "boundary_method_period": "Fictional Scope 1 backup generation; calendar 2028; GHG Protocol-style estimate",
    "permit_condition": "No real permit; fictional demo condition only",
    "value_state": "reported"
   },
   {
    "environment_record_id": "DEMO-ENV-002",
    "facility_id": "DEMO-FAC-001",
    "impact_type": "biodiversity",
    "metric_scenario": "baseline",
    "numeric_value": null,
    "unit": null,
    "boundary_method_period": "Fictional study area; no real location or baseline study",
    "permit_condition": "not-applicable",
    "value_state": "unknown"
   },
   {
    "environment_record_id": "PC-ENV-001",
    "facility_id": "PC-FAC-003",
    "impact_type": "operational-ghg",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit": null,
    "boundary_method_period": "TELUS states its AI Factories eliminate over 300 tons of carbon emissions (PC-SRC-103). An avoided-emissions claim against an unnamed baseline is not an emissions inventory. No scope, boundary, period or accounting standard is published, so no value is recorded.",
    "permit_condition": null,
    "value_state": "not-disclosed"
   },
   {
    "environment_record_id": "PC-ENV-002",
    "facility_id": "PC-FAC-001",
    "impact_type": "noise",
    "metric_scenario": "baseline",
    "numeric_value": null,
    "unit": null,
    "boundary_method_period": "No public noise study, baseline or permit condition for this site has been retrieved. The City application page (PC-SRC-101) records none.",
    "permit_condition": null,
    "value_state": "unknown"
   }
  ],
  "Jobs_Procurement_Benefits": [
   {
    "benefit_record_id": "DEMO-BEN-001",
    "facility_id": "DEMO-FAC-001",
    "benefit_type": "permanent-jobs",
    "metric_scenario": "expected",
    "numeric_value": 25,
    "unit_definition": "FTE; fictional direct permanent roles in B.C.; excludes indirect estimates",
    "period_start": "2028-01-01",
    "period_end": "2028-12-31",
    "value_state": "reported"
   },
   {
    "benefit_record_id": "DEMO-BEN-002",
    "facility_id": "DEMO-FAC-001",
    "benefit_type": "canadian-procurement",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit_definition": "CAD and supplier-location definition not yet established",
    "period_start": null,
    "period_end": null,
    "value_state": "unknown"
   },
   {
    "benefit_record_id": "PC-BEN-001",
    "facility_id": "PC-FAC-003",
    "benefit_type": "construction-jobs",
    "metric_scenario": "expected",
    "numeric_value": 200,
    "unit_definition": "Construction jobs stated in the 2012 Province of British Columbia news release for the original Kamloops data centre (PC-SRC-106). Duration, location and counting method are not published.",
    "period_start": null,
    "period_end": null,
    "value_state": "reported"
   },
   {
    "benefit_record_id": "PC-BEN-002",
    "facility_id": "PC-FAC-003",
    "benefit_type": "permanent-jobs",
    "metric_scenario": "expected",
    "numeric_value": 75,
    "unit_definition": "75 permanent skilled technical positions stated in the 2012 Province of British Columbia news release (PC-SRC-106). This is a 2012 commitment for the original facility.",
    "period_start": null,
    "period_end": null,
    "value_state": "reported"
   },
   {
    "benefit_record_id": "PC-BEN-003",
    "facility_id": "PC-FAC-003",
    "benefit_type": "permanent-jobs",
    "metric_scenario": "actual",
    "numeric_value": null,
    "unit_definition": "No delivered permanent-employment figure has been published for this facility. The 2012 commitment above (PC-SRC-106) is not evidence of delivery.",
    "period_start": null,
    "period_end": null,
    "value_state": "unknown"
   },
   {
    "benefit_record_id": "PC-BEN-004",
    "facility_id": "PC-FAC-002",
    "benefit_type": "economic-contribution",
    "metric_scenario": "expected",
    "numeric_value": null,
    "unit_definition": "TELUS states the cluster will inject $9 billion into the Canadian economy (PC-SRC-102). No method, period, geography or definition is published, and the figure covers the whole cluster rather than this site, so no value is recorded.",
    "period_start": null,
    "period_end": null,
    "value_state": "not-disclosed"
   }
  ],
  "Compute_Access_Security": [
   {
    "compute_record_id": "DEMO-CMP-001",
    "facility_id": "DEMO-FAC-001",
    "capacity_state": "installed",
    "capacity_metric": "Fictional accelerator-hours for a documented training workload and precision; not cross-hardware comparable",
    "numeric_value": 10000,
    "method_period_context": "Fictional annual accelerator-hours; stated workload and precision; excludes downtime",
    "access_program_audience": "research",
    "eligibility_price_allocation": "Fictional open call; price unknown; allocation mechanism unknown",
    "utilization_delivered_outcome": "unknown; no customer or workload data",
    "value_state": "reported"
   },
   {
    "compute_record_id": "DEMO-CMP-002",
    "facility_id": "DEMO-FAC-001",
    "capacity_state": "delivered",
    "capacity_metric": "Fictional research-access accelerator-hours; methodology not finalized",
    "numeric_value": null,
    "method_period_context": "No operating period; fictional facility is not operating",
    "access_program_audience": "research",
    "eligibility_price_allocation": "unknown",
    "utilization_delivered_outcome": "not-applicable",
    "value_state": "not-applicable"
   },
   {
    "compute_record_id": "PC-CMP-001",
    "facility_id": "PC-FAC-004",
    "capacity_state": "installed",
    "capacity_metric": "19.96 PFlop/s maximal achieved High Performance Linpack performance (Rmax) for the GPU partition, against a theoretical peak of 33.32 PFlop/s across 92,160 cores.",
    "numeric_value": 19.96,
    "method_period_context": "TOP500 submission listed in 2025 for the GPU partition only, at a submitter-chosen problem size (Nmax 2,485,248). Linpack measures one dense linear-algebra workload. It is not a general measure of AI training capability and is not comparable across hardware without a stated workload and precision.",
    "access_program_audience": "research",
    "eligibility_price_allocation": "Access is granted through the Digital Research Alliance of Canada. Default access follows account creation, additional capacity is available through the Rapid Access Service, and larger requests go through the peer-reviewed Resource Allocation Competition, which is open to applicants holding Faculty, Adjunct Faculty and Librarian positions (PC-SRC-109). The retrieved pages publish no price and no British Columbia or public-interest reservation.",
    "utilization_delivered_outcome": "SFU states the Cedar Supercomputing Centre serves more than 17,000 users, about 70 percent of them outside British Columbia (PC-SRC-107). That figure describes the centre rather than Fir alone, and no utilisation percentage is published.",
    "value_state": "reported"
   },
   {
    "compute_record_id": "PC-CMP-002",
    "facility_id": "PC-FAC-003",
    "capacity_state": "installed",
    "capacity_metric": "No published capacity metric for this facility. TELUS states the three-site B.C. cluster will house over 60,000 GPUs by 2032 (PC-SRC-102), which is a forward-looking cluster count rather than an installed Kamloops capacity, and a device count is not a capability measure.",
    "numeric_value": null,
    "method_period_context": "Proponent releases only. No workload, precision, period, utilisation or measurement method is published, so no comparable capacity value is recorded.",
    "access_program_audience": "commercial",
    "eligibility_price_allocation": "TELUS markets the Sovereign AI Factory to Canadian businesses, entrepreneurs, startups, researchers, public institutions and government organisations. No published eligibility rules, price list, allocation mechanism or public-interest reservation has been retrieved.",
    "utilization_delivered_outcome": "unknown; no delivered access, utilisation or customer information is published, and customer identities would not be recorded here in any case",
    "value_state": "not-disclosed"
   }
  ],
  "Approvals_Compliance": [
   {
    "approval_record_id": "DEMO-APR-001",
    "facility_id": "DEMO-FAC-001",
    "issuing_authority_id": "DEMO-ORG-003",
    "instrument_type_reference": "DEMO-PERMIT-001: FICTIONAL, NOT AN APPROVAL",
    "condition_commitment": "Fictional annual public filing condition",
    "reporting_deadline": "2028-03-31",
    "filing_source_id": "PC-SRC-DEMO-001",
    "assurance_provider_scope": "No real provider; fictional limited review of annual energy only",
    "compliance_status": "not-assessed",
    "breach_notice_remedy": "not-applicable",
    "penalty_clawback_reallocation": "not-applicable",
    "review_status": "not-reviewed"
   },
   {
    "approval_record_id": "PC-APR-001",
    "facility_id": "PC-FAC-001",
    "issuing_authority_id": "PC-ORG-004",
    "instrument_type_reference": "Rezoning application from I-1A (Industrial) District to CD-1 (Comprehensive Development) District to allow Bulk Data Storage use within an existing commercial building, considered under the Broadway Plan (PC-SRC-101).",
    "condition_commitment": "No rezoning approval has been granted. The application was referred to a public hearing on 2026-07-14, pulled from the 2026-07-23 public hearing agenda, and referred back to staff on 2026-07-21 for further public consultation, which the City states will not begin until after the election.",
    "reporting_deadline": null,
    "filing_source_id": "PC-SRC-101",
    "assurance_provider_scope": null,
    "compliance_status": "not-assessed",
    "breach_notice_remedy": null,
    "penalty_clawback_reallocation": null,
    "review_status": "verified"
   },
   {
    "approval_record_id": "PC-APR-002",
    "facility_id": "PC-FAC-002",
    "issuing_authority_id": "PC-ORG-004",
    "instrument_type_reference": "Allied's filed Q2 2026 quarterly report states that entitlement and power-allocation for a large-scale AI data centre are in place at 150 West Georgia (PC-SRC-104). BC + AI has not retrieved the underlying City of Vancouver instrument, its conditions or its expiry.",
    "condition_commitment": null,
    "reporting_deadline": null,
    "filing_source_id": "PC-SRC-104",
    "assurance_provider_scope": null,
    "compliance_status": "not-assessed",
    "breach_notice_remedy": null,
    "penalty_clawback_reallocation": null,
    "review_status": "review-required"
   }
  ],
  "Commitments_Performance": [
   {
    "commitment_id": "DEMO-COM-001",
    "facility_id": "DEMO-FAC-001",
    "category": "water",
    "commitment_text": "Fictional commitment to keep annual consumption at or below 2,500 m3/year",
    "target_value": 2500,
    "actual_value": null,
    "unit_period": "m3/year; calendar 2028; actual not yet reported",
    "variance_value": null,
    "due_date_status": "2029-03-31; open",
    "remedy_source_id": null,
    "value_state": "reported"
   },
   {
    "commitment_id": "DEMO-COM-002",
    "facility_id": "DEMO-FAC-001",
    "category": "access",
    "commitment_text": "Fictional research-access commitment",
    "target_value": 1000,
    "actual_value": null,
    "unit_period": "accelerator-hours; 2028; methodology pending",
    "variance_value": null,
    "due_date_status": "2029-03-31; open",
    "remedy_source_id": null,
    "value_state": "disputed"
   },
   {
    "commitment_id": "PC-COM-001",
    "facility_id": "PC-FAC-002",
    "category": "schedule",
    "commitment_text": "TELUS states the 150 West Georgia facility will come online in 2029 (PC-SRC-102).",
    "target_value": null,
    "actual_value": null,
    "unit_period": "calendar year 2029; proponent statement, not confirmed by any filed instrument",
    "variance_value": null,
    "due_date_status": "2029; open",
    "remedy_source_id": null,
    "value_state": "reported"
   },
   {
    "commitment_id": "PC-COM-002",
    "facility_id": "PC-FAC-003",
    "category": "schedule",
    "commitment_text": "TELUS states the Kamloops AI Factory will come online later this year, in a release dated 2026-05-11 (PC-SRC-102).",
    "target_value": null,
    "actual_value": null,
    "unit_period": "calendar year 2026; proponent statement with no specific date published",
    "variance_value": null,
    "due_date_status": "2026; open",
    "remedy_source_id": null,
    "value_state": "reported"
   },
   {
    "commitment_id": "PC-COM-003",
    "facility_id": "PC-FAC-002",
    "category": "heat",
    "commitment_text": "TELUS states the Vancouver facilities will recycle waste heat into district energy, heating the equivalent of 150,000 homes (PC-SRC-102).",
    "target_value": null,
    "actual_value": null,
    "unit_period": "no quantity, boundary or period published; a homes-equivalent figure is a comparison, not a delivered energy quantity",
    "variance_value": null,
    "due_date_status": "no date published; open",
    "remedy_source_id": null,
    "value_state": "reported"
   },
   {
    "commitment_id": "PC-COM-004",
    "facility_id": "PC-FAC-004",
    "category": "access",
    "commitment_text": "The Digital Research Alliance of Canada allocates access to Fir through default access on account creation, the Rapid Access Service, and the peer-reviewed Resource Allocation Competition (PC-SRC-109).",
    "target_value": null,
    "actual_value": null,
    "unit_period": "ongoing; no published quota for British Columbia based or public-interest users",
    "variance_value": null,
    "due_date_status": "ongoing; open",
    "remedy_source_id": null,
    "value_state": "reported"
   }
  ],
  "Sources": [
   {
    "source_id": "PC-SRC-DEMO-001",
    "title": "FICTIONAL demonstration source v1: not evidence of a real facility",
    "url": "demo://public-compute/fictional-source-v1",
    "source_date": "2026-08-24",
    "retrieval_date": "2026-08-24",
    "reporter": "BC + AI fictional fixture generator",
    "source_type": "public record",
    "verification_status": "superseded",
    "quality_note": "Synthetic data created only to exercise the schema.",
    "effective_period": "2026-08-24/2027-01-14",
    "superseded_by_source_id": "PC-SRC-DEMO-002",
    "dispute_correction_status": "superseded by fictional revision",
    "last_reviewed_date": "2026-08-24"
   },
   {
    "source_id": "PC-SRC-DEMO-002",
    "title": "FICTIONAL demonstration source v2: not evidence of a real facility",
    "url": "demo://public-compute/fictional-source-v2",
    "source_date": "2027-01-15",
    "retrieval_date": "2027-01-20",
    "reporter": "BC + AI fictional fixture generator",
    "source_type": "public record",
    "verification_status": "estimated",
    "quality_note": "Synthetic revision demonstrating append-only material-change history.",
    "effective_period": "2027-01-15/2027-12-31",
    "superseded_by_source_id": null,
    "dispute_correction_status": "none",
    "last_reviewed_date": "2027-01-20"
   },
   {
    "source_id": "PC-SRC-101",
    "title": "111 E 5th Ave rezoning application",
    "url": "https://www.shapeyourcity.ca/111-e-5",
    "source_date": "2026-07-23",
    "retrieval_date": "2026-08-25",
    "reporter": "City of Vancouver",
    "source_type": "public record",
    "verification_status": "official",
    "quality_note": "City of Vancouver rezoning application page. Records the rezoning requested, the applicant of record, the dated application milestones and the July 2026 referral back to staff. It states no electrical capacity, no water use and no heat-recovery condition. The July 2026 referral report sits on a City of Vancouver domain that refused automated retrieval, so it is not cited here.",
    "effective_period": null,
    "superseded_by_source_id": null,
    "dispute_correction_status": "none",
    "last_reviewed_date": "2026-08-25"
   },
   {
    "source_id": "PC-SRC-102",
    "title": "TELUS and Government of Canada advance work to scale Canada's sovereign AI infrastructure",
    "url": "https://www.newswire.ca/news-releases/telus-and-government-of-canada-advance-work-to-scale-canada-s-sovereign-ai-infrastructure-854223505.html",
    "source_date": "2026-05-11",
    "retrieval_date": "2026-08-25",
    "reporter": "TELUS Communications Inc.",
    "source_type": "public record",
    "verification_status": "proponent-reported",
    "quality_note": "Proponent news release. States an initial 85 MW secured from BC Hydro for a three-site B.C. cluster, capacity scaling to over 150 MW and over 60,000 GPUs by 2032, 98 percent renewable energy, closed-loop liquid cooling, district-energy heat recovery and water consumption 90 percent lower than traditional data centres. No boundary, period, baseline, matching basis or accounting standard is published for any of those figures, and no utility instrument is named.",
    "effective_period": null,
    "superseded_by_source_id": null,
    "dispute_correction_status": "Conflicts with PC-SRC-103 on renewable share (98 percent against 99 percent). Both are retained.",
    "last_reviewed_date": "2026-08-25"
   },
   {
    "source_id": "PC-SRC-103",
    "title": "TELUS to launch Sovereign AI Factories in Kamloops and Rimouski, propelling Canada to the forefront of AI innovation",
    "url": "https://www.newswire.ca/news-releases/telus-to-launch-sovereign-ai-factories-in-kamloops-and-rimouski-propelling-canada-to-the-forefront-of-ai-innovation-821179363.html",
    "source_date": "2025-04-15",
    "retrieval_date": "2026-08-25",
    "reporter": "TELUS Communications Inc.",
    "source_type": "public record",
    "verification_status": "proponent-reported",
    "quality_note": "Earlier proponent release covering the Rimouski and Kamloops AI Factories together. States 99 percent renewable energy, water consumption reduced by more than 75 percent against an unnamed baseline, 17 million litres saved per year, and over 300 tons of carbon emissions eliminated. Every figure is stated for the two facilities jointly, not for Kamloops alone.",
    "effective_period": null,
    "superseded_by_source_id": null,
    "dispute_correction_status": "Conflicts with PC-SRC-102 on renewable share. Neither release is treated as superseding the other.",
    "last_reviewed_date": "2026-08-25"
   },
   {
    "source_id": "PC-SRC-104",
    "title": "Allied Properties REIT Q2 2026 Quarterly Report",
    "url": "https://alliedreit.com/wp-content/uploads/2026/07/Allied_Q2QR_July-28-2026_Final.pdf",
    "source_date": "2026-07-28",
    "retrieval_date": "2026-08-25",
    "reporter": "Allied Properties Real Estate Investment Trust",
    "source_type": "public record",
    "verification_status": "official",
    "quality_note": "Quarterly report filed by the secured lender and joint-arrangement party. States that 150 West Georgia has entitlement and power-allocation for a large-scale AI data centre in place, that the property is marketed for development and operation by others, that the loan is secured by a first mortgage plus a pledge of shares in a subsidiary partially owned by Westbank, and that the facility runs to $212 million. It discloses no megawatt figure, no utility instrument and no counterparty.",
    "effective_period": "2026-04-01/2026-06-30",
    "superseded_by_source_id": null,
    "dispute_correction_status": "none",
    "last_reviewed_date": "2026-08-25"
   },
   {
    "source_id": "PC-SRC-105",
    "title": "Emerging industries connections: 2026 Call for Demand",
    "url": "https://app.bchydro.com/accounts-billing/electrical-connections/large-load/emerging-industries-connections.html",
    "source_date": null,
    "retrieval_date": "2026-08-25",
    "reporter": "BC Hydro",
    "source_type": "utility process",
    "verification_status": "official",
    "quality_note": "Utility process page for the 2026 Call for Demand. States that BC Hydro received 15 applications representing close to 800 megawatts in total load request, and that final notification is expected at the end of September 2026. It names no applicants and links no facility to the process, so it cannot be used to attribute an allocation to any record here.",
    "effective_period": null,
    "superseded_by_source_id": null,
    "dispute_correction_status": "none",
    "last_reviewed_date": "2026-08-25"
   },
   {
    "source_id": "PC-SRC-106",
    "title": "Groundbreaking of TELUS Data Centre Means More B.C. Jobs",
    "url": "https://news.gov.bc.ca/releases/2012PREM0090-000952",
    "source_date": "2012-06-29",
    "retrieval_date": "2026-08-25",
    "reporter": "Province of British Columbia",
    "source_type": "public record",
    "verification_status": "official",
    "quality_note": "Government news release for the original Kamloops data centre. States a $75 million investment, construction to LEED Gold standards, up to 80 percent less power than a typical data centre of its size, 200 construction jobs and 75 permanent skilled technical positions. These are 2012 commitments. Nothing here reports delivered performance and the facility has changed since.",
    "effective_period": null,
    "superseded_by_source_id": null,
    "dispute_correction_status": "none",
    "last_reviewed_date": "2026-08-25"
   },
   {
    "source_id": "PC-SRC-107",
    "title": "Canada's fastest academic supercomputer is now online at SFU after $80M upgrades",
    "url": "https://www.sfu.ca/sfunews/stories/2025/09/canada-s-fastest-academic-supercomputer-is-now-online-at-sfu-aft.html",
    "source_date": "2025-09-15",
    "retrieval_date": "2026-08-25",
    "reporter": "Simon Fraser University",
    "source_type": "public record",
    "verification_status": "official",
    "quality_note": "Host institution announcement. States that Fir is online at the Cedar Supercomputing Centre on SFU's Burnaby campus, that it is accessible by researchers across Canada, the funding split between the Digital Research Alliance of Canada, the B.C. Knowledge Development Fund and partners, and that the centre serves more than 17,000 users, about 70 percent of them outside B.C. It publishes no electrical load, no cooling design and no water figure.",
    "effective_period": null,
    "superseded_by_source_id": null,
    "dispute_correction_status": "none",
    "last_reviewed_date": "2026-08-25"
   },
   {
    "source_id": "PC-SRC-108",
    "title": "TOP500 system entry: Fir (GPU), Simon Fraser University",
    "url": "https://top500.org/system/180353/",
    "source_date": null,
    "retrieval_date": "2026-08-25",
    "reporter": "TOP500",
    "source_type": "technical paper",
    "verification_status": "independently-verified",
    "quality_note": "Published benchmark entry for the GPU partition: 92,160 cores, Rmax 19.96 PFlop/s, Rpeak 33.32 PFlop/s, Nmax 2,485,248, measured power 475.73 kW, AlmaLinux 9, listed in 2025 at rank 78 (June 2025), 87 (November 2025) and 105 (June 2026). High Performance Linpack measures one dense linear-algebra workload at a submitter-chosen problem size. It is not a general AI capability score and the measured power is a benchmark-run figure, not a facility load.",
    "effective_period": null,
    "superseded_by_source_id": null,
    "dispute_correction_status": "none",
    "last_reviewed_date": "2026-08-25"
   },
   {
    "source_id": "PC-SRC-109",
    "title": "Accessing Alliance advanced research computing resources",
    "url": "https://alliancecan.ca/en/services/advanced-research-computing/accessing-resources",
    "source_date": null,
    "retrieval_date": "2026-08-25",
    "reporter": "Digital Research Alliance of Canada",
    "source_type": "policy/guidance",
    "verification_status": "official",
    "quality_note": "Allocation policy page. Describes default access on account creation, the Rapid Access Service, and the peer-reviewed Resource Allocation Competition, which is open to applicants holding Faculty, Adjunct Faculty and Librarian positions. The retrieved page publishes no price and no provincial or public-interest reservation.",
    "effective_period": null,
    "superseded_by_source_id": null,
    "dispute_correction_status": "none",
    "last_reviewed_date": "2026-08-25"
   }
  ],
  "Change_Log": [
   {
    "change_id": "DEMO-CHG-001",
    "entity_table": "Electricity",
    "record_id": "DEMO-ELEC-001",
    "field_id": "PC-FLD-049",
    "old_value": "10",
    "new_value": "12.5",
    "change_type": "material-change",
    "effective_date": "2027-01-15",
    "recorded_date": "2027-01-20",
    "source_id": "PC-SRC-DEMO-002",
    "reason_review_status": "Fictional design revision; verified",
    "schema_version": "bcai-public-compute-registry-v1"
   },
   {
    "change_id": "DEMO-CHG-002",
    "entity_table": "Sources",
    "record_id": "PC-SRC-DEMO-001",
    "field_id": "PC-FLD-148",
    "old_value": "estimated",
    "new_value": "superseded",
    "change_type": "supersession",
    "effective_date": "2027-01-15",
    "recorded_date": "2027-01-20",
    "source_id": "PC-SRC-DEMO-002",
    "reason_review_status": "Fictional source revision; verified",
    "schema_version": "bcai-public-compute-registry-v1"
   },
   {
    "change_id": "PC-CHG-001",
    "entity_table": "Facilities",
    "record_id": "PC-FAC-001",
    "field_id": "PC-FLD-002",
    "old_value": null,
    "new_value": "real-public-record",
    "change_type": "initial-record",
    "effective_date": "2026-08-25",
    "recorded_date": "2026-08-25",
    "source_id": "PC-SRC-101",
    "reason_review_status": "First entry of this record from public sources; staged for steward review and fairness contact, not indexed.",
    "schema_version": "bcai-public-compute-registry-v1"
   },
   {
    "change_id": "PC-CHG-002",
    "entity_table": "Facilities",
    "record_id": "PC-FAC-002",
    "field_id": "PC-FLD-002",
    "old_value": null,
    "new_value": "real-public-record",
    "change_type": "initial-record",
    "effective_date": "2026-08-25",
    "recorded_date": "2026-08-25",
    "source_id": "PC-SRC-104",
    "reason_review_status": "First entry of this record from public sources; staged for steward review and fairness contact, not indexed.",
    "schema_version": "bcai-public-compute-registry-v1"
   },
   {
    "change_id": "PC-CHG-003",
    "entity_table": "Facilities",
    "record_id": "PC-FAC-003",
    "field_id": "PC-FLD-002",
    "old_value": null,
    "new_value": "real-public-record",
    "change_type": "initial-record",
    "effective_date": "2026-08-25",
    "recorded_date": "2026-08-25",
    "source_id": "PC-SRC-102",
    "reason_review_status": "First entry of this record from public sources; staged for steward review and fairness contact, not indexed.",
    "schema_version": "bcai-public-compute-registry-v1"
   },
   {
    "change_id": "PC-CHG-004",
    "entity_table": "Facilities",
    "record_id": "PC-FAC-004",
    "field_id": "PC-FLD-002",
    "old_value": null,
    "new_value": "real-public-record",
    "change_type": "initial-record",
    "effective_date": "2026-08-25",
    "recorded_date": "2026-08-25",
    "source_id": "PC-SRC-107",
    "reason_review_status": "First entry of this record from public sources; staged for steward review, not indexed.",
    "schema_version": "bcai-public-compute-registry-v1"
   },
   {
    "change_id": "PC-CHG-005",
    "entity_table": "Lifecycle_Milestones",
    "record_id": "PC-MS-004",
    "field_id": "PC-FLD-042",
    "old_value": "reported",
    "new_value": "superseded",
    "change_type": "lifecycle-change",
    "effective_date": "2026-07-21",
    "recorded_date": "2026-08-25",
    "source_id": "PC-SRC-101",
    "reason_review_status": "The 2026-07-23 public hearing was pulled from the agenda and the application was referred back to staff on 2026-07-21. The planned milestone is superseded and retained rather than deleted.",
    "schema_version": "bcai-public-compute-registry-v1"
   },
   {
    "change_id": "PC-CHG-006",
    "entity_table": "Electricity",
    "record_id": "PC-ELEC-014",
    "field_id": "PC-FLD-056",
    "old_value": "99",
    "new_value": "98",
    "change_type": "disputed-claim-recorded",
    "effective_date": "2026-05-11",
    "recorded_date": "2026-08-25",
    "source_id": "PC-SRC-102",
    "reason_review_status": "Two proponent releases state different renewable shares for the same facilities. Both are retained, the value is held in a disputed state, and BC + AI has not reconciled them.",